項目展示Project Display
模擬制動試驗臺
Simulated brake test bench
制動系統測試臺用于制動系統的單個零件和連接質量驗證。該制動系統測試臺可以模擬現實條件下的制動系統,并且更易于更換部件,監控制動系統的性能要比在實際車輛中要好。
The brake system test bench is used for the brake system single part and connection quality validation. The brake system test bench enable simulating the brake system working in the reality condition, and easier to replace the components, monitor the brake system performance than in the real vehicle.
充電樁改造項目
Charging pile renovation project
將研發停車場當前使用的電動汽車充電支柱更換為新的充電支柱(由供應商設計并經BBT-E-60 確認),并適用于 B 型 RCD 和斷路器的直接安裝。此新支柱必須適用安裝一個和兩個電動汽車充電墻盒。
Exchange of the current used EV(Electric Vehicle)-Charging pillars in the R&D parking lots to new charging pillars (designed by the supplier and confirmed by BBT-E-60), which are suitable for the direct installation of type B RCDs and circuit breakers together. This new pillar must be suitable for the mounting of one and also two EV-Wallboxes.
BBT-E-51直流充電樁項目
BBT-E-51 DC charging pile project
本項目投資用來購買能覆蓋國內及出口市場相應標準的大功率充電設施,用來確保所有G08BEV車輛的充電需求。
Investment needed for high power charging facility to cover local and export market charging and to guarantee all G08BEVs daily charging.
汽車生產線安裝項目
BIW Euipment Installation project
項目:偉巴斯特C346 生產線
時間:2016年01月-12月
項目描述 / Project Description:
項目包含,所有的夾具及傳輸設備的設計及制作。電氣部分的整體設計與調試。
Date:01-12 ,2016
Project: C346 production line
The project includes the design and manufacture of all fixtures and transmission equipment. The overall design and commissioning of the electrical part.
汽車生產線安裝項目
BIW Euipment Installation project
項目:米其林輪胎生產線
時間:2017年01月-12月
項目描述:項目包含,所有的夾具及傳輸設備的組裝調試。
Project:Michelin tire production line
Date:01-12,2017
Project Description: Theproject includes the assembly and commissioning of all fixtures andtransmission equipment.
汽車生產線安裝項目
BIW Euipment Installation project
項目:寶馬發動機維修工位缸蓋下線工裝
時間:2016年09月-12月
項目描述:此項目包含機械結構設計及制作。
Project:BMW engine repair station cylinder head off-line tooling
Date:09-12,2016
Project Description: This project includes mechanical structure design and production.
真空設備改造項目
Vacuum equipment renovation project
時間:2015年09月-12月
項目描述:2015年09月起,我公司承接了沈陽恒進真空設備有限公司一臺真空設備結構及外觀改造。
Date:09-12,2015
Project Description: Since September 2015, our company has undertaken a vacuum equipment structure and
appearance modification of Shenyang Hengjin Vacuum Equipment Co., Ltd.
德科(沈陽)斯米爾吸附模具脫模劑設備項目
DR?XLMAIER Adsorption Mold Release Agent Equipment Project
時間:2017年10月-2018年2月
項目描述:項目包含,所有的夾具及傳輸設備的設計及制作。電氣部分的整體設計與調試。
Date:10.2017-02.2018
Project Description: The project includes the design and manufacture of all fixtures and transmission
equipment. The overall design and commissioning of the electrical part.
華晨寶馬組裝車間–前臉裝配工裝國產化
BMW Brilliance Assembly Workshop – Localization of front face assembly tooling
時間:2016年3月-12月
項目描述:2016年3月起,我公司承接華晨寶馬組裝車間
–前臉裝配工裝國產化。
項目包含夾具的制作、安裝調試。
Date:03-12,2016
Project Description: Since March 2016, our company has undertaken the localization of front face assembly tooling for the BMW Brilliance assembly workshop.
The project includes the production, installation and commissioning of the fixture.